Site Voyance Ltd · Consultation draft v0.3

Shared electrical containment

Not an approved industry standard and not a safe system of work. Do not use this app to authorise live work, opening unsafe containment, or testing a neighbouring circuit.

Version 0.3 · 7 November 2026

Communal metering, shared containment

Meter cupboards and risers often hold equipment for more than one flat, supplier and contractor. A defect in that shared space can harm the next worker and, where the cupboard is reachable, residents. Isolating one meter does not make the trunking dead.

This framework makes existing safety duties easier to apply at the joins between the building network operator, the building owner, suppliers, metering organisations and residents. It does not create a new universal legal duty, and it does not claim a statutory communal electrical MOT.

01

Inspect

A documented, risk-based inspection and maintenance programme for communal containment.

02

Assess

A Shared Containment Disturbance Assessment inside the metering work risk assessment.

03

Decide

A consistent continue, control, or stop-and-escalate decision, including protection of residents.

04

Coordinate

A named dutyholder, normally the BNO where the containment is BNO-controlled, without owning every cable.

05

Rectify

Competent contractors may tender for planned repair. Urgent danger is controlled before tendering.

06

Account

A justified Infrastructure Safety Abort is kept out of avoidable-failure metrics. Cost recovery is a separate contract question.

The white paper

The consultation document itself, not a summary. Read it here. Download any file. These links stay on the published app.

Download white paper
White paper, page 1 of 19White paper, page 2 of 19White paper, page 3 of 19White paper, page 4 of 19White paper, page 5 of 19White paper, page 6 of 19White paper, page 7 of 19White paper, page 8 of 19White paper, page 9 of 19White paper, page 10 of 19White paper, page 11 of 19White paper, page 12 of 19White paper, page 13 of 19White paper, page 14 of 19White paper, page 15 of 19White paper, page 16 of 19White paper, page 17 of 19White paper, page 18 of 19White paper, page 19 of 19

Shared equipment, fragmented control

Several meters may sit in one trunking or riser, for different suppliers, with different cable owners and a history of covers being removed and refitted. The visiting engineer can assess the task. That point-of-work assessment does not replace the infrastructure controller’s inspection and defect programme, and the engineer is not there to repair another flat’s cables under a meter-exchange order.

If the engineer stops, the visit can be recorded as a failure, and the defect can pass between managers with no common reference and no confirmed close-out. The next engineer, or a resident, then meets the same condition.

Shared infrastructure needs an identifiable controller. Everyone working on or near it still owns the safety of their own activity.

Hazard pathways

  • Cover integrity. Cracked, bent, loose or missing lids, and the chance the public can reach electrical parts.
  • Fastener penetration. Screws of the wrong length or position entering the enclosure. Judge fixings against the actual containment, not a universal spacing rule.
  • Cable congestion. Tight bundles and movement transferred to neighbouring circuits. No blanket fill percentage is asserted.
  • Edges and entries. Missing bushes, sharp metal and abrasion where cables enter.
  • Insulation. Nicked, taped or heat-damaged insulation, including damage revealed only when cables move.
  • Live neighbours. An acceptable isolation of one meter does not make the shared trunking dead.
  • Metalwork. Uncertainty about earthing or enclosure integrity. Verification must not require hazardous contact.
  • Place and public. Damp, heat, poor light, combustible storage, and resident access.

Gloves are not a substitute for controlling the hazard. A damaged cover must not be refixed with a convenient long screw without knowing what is behind it. Single-insulated conductors are not unsafe merely because they are inside suitable, fully enclosed containment. The concern is damaged insulation, a failed enclosure, or unsafe access.

What the proposal rests on

Electricity at Work Regulations 1989, especially the duties on construction, maintenance, mechanical damage, insulation, and work on or near live conductors. The Management of Health and Safety at Work Regulations 1999 require a suitable assessment of risks to employees and to other people. The Health and Safety at Work etc. Act 1974 extends duties, so far as reasonably practicable, to people outside the employment, which matters where residents can reach a cupboard.

UK Power Networks’ BNO guidance describes design, installation, maintenance and safety responsibilities for the building network. ENA EREC G87 and G104 are relevant to multiple-occupancy connections and to legacy rising and lateral mains, and still need to be read against the actual building. England’s rented-sector five-year checks do not apply to communal areas under those rules, which is not a reason to leave a shared system uninspected.

Nothing reviewed here creates a universal duty for every BNO to pay for every third-party meter tail, or an automatic liability for a supplier’s failed-visit charge.

Two assurance layers

Controller

An asset register, a baseline look at older installations, intervals set by condition and consequence, extra inspection after damage or repeated aborts, a defect register, and planned refurbishment where local repairs will not hold. No annual or five-year interval is claimed as existing law.

Engineer

Before work that could disturb shared containment, record the foreseeable interface with neighbouring circuits. The assessment does not certify the block. If an adjacent circuit cannot be identified or isolated as needed, or the work could move damaged live conductors, do not proceed without further authority.

Disturbance assessment

A training aid, not a permit. Answer only what you can see without creating danger. Unknown is not a No. The result is calculated from what you record. You cannot mark the task as clear while a stop answer is recorded.

Pictures are offered only on questions about something you can see: the cover, fixings, damage, congestion, edges, metalwork, the place, and whether residents can reach it. They are not asked for isolation authority, a missing controller, or whether the task will move a tail. Do not open a hazard to take one.

This is a training and consultation exercise, not a work permit. Until you upload, pictures stay in this browser only. Upload stores the report and its pictures in this app’s private consultation store, under your sign-in. They are not emailed, and nobody else is given a list of them. Feedback goes to that same store, not to an address, because this draft publishes none.

  • 1. Cover missing, loose, bent, damaged or inadequately secured?

  • 2. Fasteners or penetrations could damage enclosed cables?

  • 3. Exposed copper, damaged insulation or makeshift repairs?

  • 4. Unprotected edges or signs of abrasion?

  • 5. Congestion likely to move other circuits?

  • 6. Non-sheathed conductors could be exposed if the enclosure is disturbed?

  • 7. Adjacent conductors may stay live and be affected?

  • 8. Circuit identity, isolation boundary or authority unclear?

  • 9. Concern about accessible metalwork?

  • 10. Working space, access or lighting inadequate?

  • 11. Water, heat or other environmental damage?

  • 12. Residents can reach a potentially hazardous area?

  • 13. The cover cannot be refitted without undue force?

  • 14. No responsible controller or emergency contact?

  • 15. The task moves shared containment or tails?

If you leave now, can residents still reach a hazard?

Assessment incomplete — 0 of 15 questions answered.

Yes 0. Unknown 0. Counted separately from completion. A low count is not a clearance.

Resident access, not one of the 15: not answered.

Proposed decision

Choosing one does not make it safe. These rules are a training aid and still need technical review before anyone uses them as operational guidance.

Calculated result

Assessment incomplete — 0 of 15 questions answered.

From report to close-out

  1. 1Identify. Record location, what was seen, who could be affected, and whether the task continued.
  2. 2Protect. If there is immediate danger, get competent help and restrict access. Do not wait for an ownership argument.
  3. 3Notify. Tell the employer and the known controller. If the controller is unknown, tell the building manager. A missing contact is itself a defect.
  4. 4Allocate. One defect reference and one case owner.
  5. 5Commission. Planned work is scoped, isolated and procured. Urgent making-safe comes first.
  6. 6Verify. Authorised inspection or test evidence, then tell the affected parties. A file note is not a clearance.
  7. 7Prevent. Repeated defects trigger a look at maintenance, design and access.

Ownership, operational control, safety coordination and cost liability may be four different answers. Do not infer ownership from cable colour or the branding on a nearby meter.

Infrastructure Safety Abort

A metering visit reasonably suspended because communal infrastructure outside the contractor’s authorised task prevents safe work. It is an administrative outcome, not a finding of legal liability.

  • Keep a substantiated abort out of avoidable engineer and contractor failure scores.
  • Keep the safety record. Do not delete the appointment to tidy a KPI.
  • Review the evidence pack. A contested case is judged on what was known at the time, without a demand to re-enter the hazard.
  • Cost recovery, if any, follows only after responsibility and a charging basis are established. There is no automatic charge to the BNO.

Recommendations for consultation

  1. Name a controller for each shared intake, with an emergency contact.
  2. Run a risk-based inspection regime for BNO-controlled communal containment.
  3. Use a task-specific disturbance assessment where work may affect adjacent circuits or covers.
  4. Publish common stop, protection and escalation criteria, including when public access must be controlled.
  5. Use one defect reference through to verified closure.
  6. Keep stable BNO and DNO details apart from changing supplier and meter appointments.
  7. Treat multi-party cable replacement as coordinated infrastructure work, not a one-meter job.
  8. Let competent authorised contractors, including supplier-associated firms, bid for planned repairs.
  9. Fund emergency making-safe first; allocate cost later. Do not let a dispute delay protection.
  10. Keep an evidenced Infrastructure Safety Abort out of avoidable-failure scores. Recover cost only where the contract allows.
  11. Ground any extra tests in existing standards, after a clause-by-clause review.
  12. Design new buildings, and refurbish legacy risers, so one meter job does not have to disturb another flat.

What a pilot would show

Pilot governance and reporting in a few buildings with known owners. Do not pilot exposure to danger. Useful signs: faster acknowledgement, interim control before ownership is argued, closures that carry evidence, and fewer later visits finding the same unresolved hazard. A request that someone re-enter a hazard only to finish the form is a failure of the pilot, whatever the other numbers say.

Still unread clause by clause: full CoMCoP, the relevant parts of BS 7671, ENA G87 Issue 3 and G104 Issue 1, distribution licences, connection agreements, and the leases and contracts for the building. 7 November 2026.

Submit feedback

No confirmed contact address is published in this draft, so a comment is not emailed. Submit feedback uploads it to this app’s private consultation store, under your sign-in, and names version 0.3 and the section you reviewed. There is no deadline on this page.